The Woodward easYgen-3500-XT was utilized in a complex power management project for United Plantation at Ulu Bernam. The project required the Prime Mill and Optimill, located one kilometre apart, to load share and provide backup power when necessary. The...
The upgrade of 20 engines for a 32.8MW Prime Power Plant from using custom PLCs to Woodward’s flexible easYgen 3000XT and LS-5 platform was a challenging task. The facility, which supports America’s Interests abroad, was required to operate continuously and could not...
The CCGS Louis S. St-Laurent, also known as NGCC Louis S. St-Laurent, is a highly advanced heavy icebreaker that serves under the Canadian Coast Guard (CCG). As the largest icebreaker in the CCG fleet, Louis S. St-Laurent boasts of cutting-edge features and...
Synchronization and Load sharing panels for 24 MW Gasturbine Generator and 30 MW Steam turbine generator with a 132 kV Grid entrusts Matix Fertilizer & Chemicals to Woodward’s easYgen-3500XT-P2 and LS-6XT controllers visualized on Woodward’s easYview...
Istanbul’s largest hospital’s power generation needs gets covered by 26 Yanmar 2500 kVA diesel generators controlled by 26 easYgen-3500XT-P1 controls, ensuring seamless load-sharing and synchronization between the generators. Bus and mains breakers are...