Select Page

Prime Mill and Optimill with complex power management system

The Woodward easYgen-3500-XT was utilized in a complex power management project for United Plantation at Ulu Bernam. The project required the Prime Mill and Optimill, located one kilometre apart, to load share and provide backup power when necessary. The...

Camp Lemonier Djibouti Prime Power Plant

The upgrade of 20 engines for a 32.8MW Prime Power Plant from using custom PLCs to Woodward’s flexible easYgen 3000XT and LS-5 platform was a challenging task. The facility, which supports America’s Interests abroad, was required to operate continuously and could not...

Canadas largest Ice breaker CCGS Louis S. St-Laurent

The CCGS Louis S. St-Laurent, also known as NGCC Louis S. St-Laurent, is a highly advanced heavy icebreaker that serves under the Canadian Coast Guard (CCG). As the largest icebreaker in the CCG fleet, Louis S. St-Laurent boasts of cutting-edge features and...

62,5 MW Backup Power – Istanbul’s Basaksehir city hospital

Istanbul’s largest hospital’s power generation needs gets covered by 26 Yanmar 2500 kVA diesel generators controlled by 26 easYgen-3500XT-P1 controls, ensuring seamless load-sharing and synchronization between the generators. Bus and mains breakers are...