Hydropower plant with Pelton Turbines in Malaysia

Introducing the ultimate solution for your cascade hydro plant needs, including installation and commissioning services. The system features two 8MW pelton turbines at the upper plant and two 5MW pelton turbines at the lower plant, for maximum efficiency and power generation.
The following equipment ensures the plant to be operating at peak performance:

  • Pelton Turbine Speed Control (505HT)
  • Excitation System (DECS-250)
  • Turbine Monitoring and Control (easYgen-3400XT-P2 + RP3000XT)
  • Turbine Aux machineries management (AB PLC)
  • Plant Monitoring, Control and Operation (AB PLC)
  • Comprehensive Alternator Protection (SEG Protection Relays)
  • virtual server based power plant with full scale Scada ready for IoT connectivity

IT security ready: hardened interfaces could make it possible to easily monitor and remote control the plant from anywhere in the world.

The next upgrade will include the replacement of the fiber optic network connecting the upper and lower plants with site-to-site VPN using Starlink Satellites Internet, for the ultimate in connectivity and reliability. Trust Woodward to provide the most advanced and reliable solution for your hydro plant needs.

Markets and Applications

Hydro Power

Products & Services

505 Turbine Controller | easYgen-3000XT | easYview